Your Cart
Loading

126 Construction Project Templates

On Sale
$10.00
$10.00
Added to cart

Here is the list of templates and file type:


1 Accident or incident report.pdf

2 Accident or incident report--minor occurrence.pdf

3 Accident or incident report--witness statement.pdf

4 Advising subcontractor of due date to apply for pa.pdf

5 AE adds more items in subsequent punch list.pdf

6 AE doesn't agree with subcontractor's requisition.pdf

7 AE overdue in returning shop drawings.pdf

8 AE questions subcontractor's costs.pdf

9 AE requests contractor to slow down work in an are.pdf

10 Change by AE will result in extended completion da.pdf

11 Confirming verbal instructions from AE.pdf

12 Deducting value of punch list items from subcontra.pdf

13 Emergency number list.pdf

14 Engaging another subcontractor to correct work.pdf

15 Field office trailer checklist.pdf

16 Final letter to AE when shop drawings are not retur.pdf

17 Final payment held up by AE for warranty, not punc.pdf

18 First request to subcontractor to clean work areas.pdf

19 Follow-up letter requesting cost proposal.pdf

20 Follow-up to letter requesting shop drawing schedul.pdf

21 Follow-up to subcontractor's disputing obligations.pdf

22 Hiring another subcontractor to complete work.pdf

23 Inquiring about status of payment from owner.pdf

24 Inquiry to AE about recently submitted PCO, RFI, R.pdf

25 Job site binder setup.pdf

26 Letter forcing a response from subcontractor.pdf

27 Material safety data sheet (MSDS) register.pdf

28 Monthly project review worksheet.pdf

29 No response from AE to query about PCO, RFI, RFC.pdf

30 Notice of subcontractor safety violation form.pdf

31 Notice to clean up.pdf

32 Notice to correct.pdf

33 Notice to subcontractor that AE has rejected work.pdf

34 Notifying AE of switch of utility costs to owner.pdf

35 Notifying AE of weather-related delay.pdf

36 Notifying AE that delay in shop drawing return will.pdf

37 Notifying owner of its share of utility costs.pdf

38 Owner or AE advises of impending change in work.pdf

39 Owner sends another punch list to contractor.pdf

40 Performing T&M work when AE or owner doesn't sign .pdf

41 Preconstruction meeting checklist.pdf

42 Preproject handoff meeting form.pdf

43 Proceeding with T&M work without agreement on fina.pdf

44 Proceeding with work on T&M basis.pdf

45 Project closeout memo to subcontractors.pdf

46 Project closeout procedures.pdf

47 Project manager or project superintendent preconstruction review.pdf

48 Project start-up checklist.pdf

49 Putting subcontractor on notice for poor performan.pdf

50 Quality control checklist--Concrete Form Removal.pdf

51 Quality control checklist--Concrete Reinforcement.pdf

52 Quality control checklist--Concrete.pdf

53 Quality control checklist--Demountable Partitions.pdf

54 Quality control checklist--Earthwork.pdf

55 Quality control checklist--Finish Carpentry.pdf

56 Quality control checklist--Flashing and Sheetmetal.pdf

57 Quality control checklist--Gypsum Drywall.pdf

58 Quality control checklist--Hydraulic Elevators.pdf

59 Quality control checklist--Interior Glass and Glazing.pdf

60 Quality control checklist--Landscaping.pdf

61 Quality control checklist--Lockers and Benches.pdf

62 Quality control checklist--Membrane Roofing.pdf

63 Quality control checklist--Metal Deck.pdf

64 Quality control checklist--Metal Doors and Frames.pdf

65 Quality control checklist--Metal Stairs.pdf

66 Quality control checklist--Metal Toilet Partitions.pdf

67 Quality control checklist--Miscellaneous Metal.pdf

68 Quality control checklist--Painting.pdf

69 Quality control checklist--Pavements and Walks.pdf

70 Quality control checklist--Resilient Flooring.pdf

71 Quality control checklist--Roof Insulation.pdf

72 Quality control checklist--Rough Carpentry.pdf

73 Quality control checklist--Sealants and Caulking.pdf

74 Quality control checklist--Seamless Elastomeric Flooring.pdf

75 Quality control checklist--Steel Joists.pdf

76 Quality control checklist--Structural Steel.pdf

77 Quality control checklist--Toilet Room Accessories.pdf

78 Rejecting defective or nonconforming work.pdf

79 Renovation Proposal v1.xls

80 Request for Clarification (RFC) form.pdf

81 Request for expedited review of shop drawings.pdf

82 Request for Information (RFI) form--type 1.pdf

83 Request for Information (RFI) form--type 2.pdf

84 Request for inspection prior to backfilling.pdf

85 Request that AE review pencil copy of requisition.pdf

86 Request to subcontractor to review baseline schedu.pdf

87 Request to subcontractor to submit shop drawing sch.pdf

88 Requesting additional sets of drawings from AE.pdf

89 Requesting close-in inspection from AE.pdf

90 Requesting cost proposal from subcontractor.pdf

91 Requesting lien waiver from subcontractor.pdf

92 Requesting lien waivers from lower-tier subcontrac.pdf

93 Requesting punch list from AE.pdf

94 Requesting schedule of work from subcontractor.pdf

95 Requesting subcontractor complete punch list.pdf

96 Requesting substitution of a product.pdf

97 Requesting visit from architect to establish Subst.pdf

98 Responding to owner's request for partial occupanc.pdf

99 Responding to subcontractor's request for off-site.pdf

100 RFI log--type 1.pdf

101 RFI log--type 2.pdf

102 Safety violation notice--company.pdf

103 Safety violation notice--individual.pdf

104 Second letter requesting punch list from AE.pdf

105 Second request to correct rejected work.pdf

106 Site team progress meeting.pdf

107 Subcontractor failure to start work on time.pdf

108 Subcontractor negotiation form.pdf

109 Superintendent's notice of pending backcharges.pdf

110 Tool inventory list.pdf

111 Toolbox talk sign-in sheet.pdf

112 Transmitting punch list to subcontractor.pdf

113 Transmitting to subcontractor inspection report re.pdf

114 Unit punch list for finishes.pdf

115 Visitor log.pdf

116 When AE issues sketches containing changes.pdf

117 When previous letters regarding payment go unanswe.pdf

118 When previous letters to AE do not produce shop dra.pdf

119 When subcontractor claims another subcontractor ow.pdf

120 When subcontractor disagrees with reason for rejec.pdf

121 When subcontractor disputes contract obligations.pdf

122 When subcontractor fails to complete punch list wo.pdf

123 When subcontractor has not completed rework.pdf

124 When subcontractor may be late in completing work.pdf

125 When subcontractor takes issue with AE finding.pdf

126 When subcontractor threatens to reduce manpower.pdf


Note that they are "zipped" up for ease of uploading and downloading here. If you need an unzipping program, you can download one for free from here: https://www.7-zip.org/download.html

You will get a ZIP (6MB) file