Construction Cost Control (PDF edition)
The contract sum was 26,301,102. The final account was 29,153,363. The building that was handed over is the building that was drawn.Nothing exotic happened at Pemberton Yard. No insolvency, no fire, no unforeseeable ground, no litigation. Ninety-six apartments over six stories, signed for 94 weeks, and the client paid 2,852,261 more than it agreed to, which is 10.8 per cent. This book takes that figure apart eleven times, one chapter per line, and finds that every pound of it is one of three things. Building the client bought: 1,052,000. Price the client lost: 2,030,500. Money recovered: 230,239.Then the sentence the book exists for: of the price lost, 1,742,160, or 85.8 per cent, was knowable on the day both parties signed. Not foreseeable in the loose sense. Knowable, because the inputs were sitting in the room and nobody was asked to add them up. The design was 72.0 per cent issued, which put 6,852,067 of the building beyond a fixed price. The provisional sums stood at 1,340,000 and released at 2,150,000, an overrun of 60.4 per cent and the largest single line in the account. The time-related preliminaries ran at 23,065 a week and nobody on the project could state the figure.Then the consequence, and it is not a cost consequence. The scheme was underwritten at 17.40 per cent profit on cost and delivered 8.59, losing 46.6 per cent of the profit to a 10.8 per cent overrun. The appraisal could absorb 732,546 before it broke, which is 2.8 per cent, and the gap ran 3.9 times that.Then the same building, bought differently. A complete design and almost no provisional sums cost 90,648 more at the contract and 1,620,289 less at the final account, a return of 17.9 to 1, and the delivered profit on cost goes from 8.59 to 13.40 per cent.The models are not described; they are supplied. Four Excel workbooks accompany the book: both bridges with all eleven lines and their workings; the appraisal run six ways with the break-even solved in closed form; six one-input sensitivities that print every line for every scenario, not just the total; and a calculator for a project that has not been signed yet, which forecasts the five knowable lines and refuses to forecast the four that are not. Every printed figure is reproduced by a live formula under 242 checks. Nothing is locked, protected or watermarked. The closing pages say where to download them.Design development beyond the contractor's allowance, provisional sums, client changes split into the scope bought and the premium lost, prolongation, disruption, statutory change, escalation, contra-charges, liquidated damages set below the client's own weekly cost, and the retention that was never released. Rate loading, concurrency, the valuation hierarchy, and the notice calendar that turns an entitlement into money. Forty-three questions to ask before signature, and a thirty, sixty and ninety day programme for after it.For development managers who sign contract sums, fund and asset managers who underwrite them, lenders and monitoring surveyors sizing a facility, and quantity surveyors and cost consultants on either side of the table. It assumes you can read a priced document. It assumes nothing else.
This edition: PDF, 6 x 9 in, 180 pages, DRM-free. The free companion Excel workbooks for this book are at julianrsterling.com/costcontrol.