Construction Quality & Technical Control Bundle — QA/QC, RFI/Submittals, NCR/SOR & Quality KPI
A connected professional quality and technical-control system covering M3 Design Management through M7 Handover & Formal Closeout.
The bundle combines four specialist SCMA products to connect QA/QC inspections, RFI and submittal control, NCR/SOR corrective actions, and quality KPI reporting while preserving the native references, evidence trail, and authority structure of each control system.
What’s Included
Construction QA/QC Forms & Registers Pack — $29.99
RFI, Submittal & Document Control Toolkit — $29.99
NCR, SOR & Corrective Action Toolkit — $19.99
Construction Quality KPI Dashboard System — $59.00
Plus:
P23 Bundle Integration Layer — SCMA-BDL-QT-001
Included at no additional cost.
Individual Product Value: $138.97
Bundle Price: $99.00
You Save: $39.97 — approximately 29%
Key Benefits
- Connect inspections, technical approvals, quality findings, and corrective-action closure.
- Keep QA/QC, RFI/Submittal, and NCR/SOR records within their correct native systems.
- Use optional QT Link IDs to trace significant issues across toolkits without duplicating source records.
- Track ageing, response time, closure performance, recurring findings, and quality trends.
- Link technical-information status with material and work inspection readiness.
- Separate corrective-action response, correction, verification, and final closure.
- Support management review from design through construction and formal closeout.
Lifecycle Position
Primary Coverage: M3 → M7
Strongest Application:
M3 Design Management | M5 Mobilization | M6 Construction & Project Delivery | M7 Handover & Formal Closeout
Important Control Boundary
A dashboard, KPI, inspection status, technical review, or RACI entry does not by itself create contractual acceptance or delegated approval authority.
Received ≠ Reviewed ≠ Approved ≠ Current for Use ≠ Inspected ≠ Accepted ≠ Closed
Source records and project-specific authority remain primary.
The bundle supports quality and technical management but does not replace the executed contract, approved specifications, ITPs, project quality plan, statutory requirements, delegated-authority framework, or specialist technical judgment.
Best For
QA/QC Managers | Project Managers | PMCs | Consultants | Contractors | Document Controllers | Technical Managers | Construction Managers | Site Engineers | Quality Engineers | Owner’s Representatives