Lifting Operations Pack
Paperwork for lifting on site: a lifting operations procedure, lift plan template, tower crane, mobile crane and slinging/signalling RAMS, a lifting equipment register with pre-use accessory checks, four toolbox talks and a completed lift plan example (steel beam by hired crane). Word and printable PDF, with a blank logo box and yellow fill-in fields. Written and checked by Max Wensley, a working SMSTS site manager.
These templates do not replace a lift plan prepared by a competent appointed person; complex lifts need specialist planning. Always follow the crane and accessory manufacturer’s instructions and your hire terms. Adapt to your site and have them checked by a competent person.