Your Cart
Loading

Contractor Project Pack, Drylining

On Sale
£99.00
£99.00
Added to cart

The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Fixing of plasterboard (or similar sheet lining material) to metal or timber stud partitions and soffits, including cutting, fixing, and preparation for tape and jointing, in accordance with the project specification. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.


You will get a DOCX (349KB) file