GMP Change Control Log Excel | Change Control Tracker with Impact Assessment, Risk Score & Actions

On Sale
$34.00
$34.00
Added to cart

A change to a method, instrument, supplier, SOP or process is only finished when it has been assessed, approved before implementation, carried out and shown to work. This Excel change control log tracks every change request through that lifecycle and flags the gaps an auditor would find.


Raise a change on the Change Register and score Severity, Probability and Detectability (1-5 each, using the ICH Q9 risk concepts). The workbook calculates the RPN and suggests a Minor, Major or Critical class from thresholds you set; QA enters the final class and the regulatory action. On the same row of the Impact Assessment you answer Yes, No or TBD for 12 areas: quality, validation, methods, stability, regulatory, documents, training, data integrity, equipment, cleaning, supply and EHS.


The Action Plan holds pre-implementation, post-implementation and before-closure actions with owner roles and due dates, and checks the sequence automatically. The lifecycle stage (Raised, Under assessment, Approved - implementing, Implemented - closure pending, Effectiveness check, Closed) is worked out from the dates you enter. Flags catch implementation before QA approval, overdue implementation or effectiveness checks, closure with open actions or without an effectiveness result, open impact areas at approval and classes set below the suggestion.


The Dashboard shows stage and flag counts, open and closed changes by type and class, average days to close, a 12-month raised / closed trend and a risk heat map. 14 fictional EXAMPLE changes and 27 actions show how it works.


What's included

• Change-Control-Tracker.xlsx (7 tabs)

• Start Here: quick start, colour key, rules, disclaimer

• Dashboard: tiles, stages, flags, by type and class, 12-month trend

• Change Register (300 changes): RPN, suggested class, stage, effectiveness due date, flags

• Impact Assessment: 12 areas per change with completion status

• Action Plan (500 actions): phase, owner role, due dates, status and sequence check

• Risk Scoring: example 1-5 scales and S x P heat map; Lists: types, departments, roles and thresholds

• User-Guide.pdf (8 pages): set-up, the change lifecycle, how risk, class, stage and every flag are decided, public references and disclaimer

• Fictional EXAMPLE data: 14 changes and 27 actions that show nearly every flag


Who it's for

• QA teams and change control coordinators in small GMP sites

• QC laboratory managers handling method, instrument and SOP changes

• Start-ups, CDMOs and CROs that need a structured change log before buying an eQMS

• Anyone preparing change control records for audits and management review


File formats and compatibility

• Microsoft Excel .xlsx workbook plus a PDF user guide, delivered as one zip

• Built for Microsoft Excel 2019/365 (.xlsx, no macros). Tested in LibreOffice Calc. Google Sheets import is possible but not officially supported.

• No add-ins, internet connection or macros required

• Instant digital download; no physical item is shipped


FAQ

Q: How is the change class decided?

A: Severity x Probability x Detectability gives an RPN from 1 to 125. Critical is suggested when the RPN or Severity passes your thresholds, Major above a lower threshold, otherwise Minor. All thresholds are on Lists. QA sets the final class; a class below the suggestion is flagged for a written justification.


Q: Can I change the risk scales and impact areas?

A: Yes. The 1-5 scales on Risk Scoring are examples; replace them with the scales in your own quality risk management SOP. Change types, departments, owner roles and timings are on Lists.


Q: Does it replace an eQMS?

A: No. It is a spreadsheet tracker. It has no workflow routing, e-signatures or automatic audit trail.


Q: Is it validated or compliant out of the box?

A: No. It is a template. No spreadsheet is compliant on its own, and this file is not a validated computerised system or a Part 11 / Annex 11 electronic records system. Verify the formulas with your own data and approve it under your own procedures before GMP use.


Q: Is the example data real?

A: No. All EX-CC changes, actions and roles are fictional. Clear the white input cells before first use.


Disclaimer: Template only. This workbook is a tracking and calculation aid. It is not regulatory, legal or quality advice, it does not make your processes compliant, and it is not a validated computerised system: validate it for your intended use under your own procedures before relying on it for GMP decisions. Public guidelines (ICH, EU GMP, US 21 CFR, USP and others) are cited for concepts only. Rangefolio is not affiliated with or endorsed by ICH, USP, EDQM, FDA, EMA or PIC/S. All example data is fictional.