Supply Chain Management (PDF edition)
Four managers describe the same pile of stock on the same Monday morning. Four different numbers come back. All four are called the service level, and all four are correct.
That room is where this book starts, and it does not leave until every one of those numbers has been translated into the others and priced in euros a year.
One product line, carried from the first page to the last. There is one company here, one part number, one supplier and one lead time. Nothing is averaged across a family, nothing hides inside an aggregate, and every figure printed comes out of a single model the reader can rebuild. A line that ships 95,680 units a year and earns 1,808,352 EUR of margin is large enough that the decision is real and small enough to hold in your head.
What the book establishes, with arithmetic you can redo:
- Why a cycle service level of 98 per cent and a fill rate of 99.3846 per cent describe the same warehouse, and what the conversion between them depends on.
- Why the obvious inventory reduction is a false economy: it releases 48,865.25 EUR of working capital once and costs 18,490.12 EUR every year afterwards, and the memo proposing it is correct in every sentence it contains.
- Where the cost minimising service level actually sits, and how flat the bowl is around it: the whole argument between 97 and 99.5 per cent is worth 6,197.72 EUR a year.
- Why 90.5155 per cent of the variance the safety stock exists to absorb comes from the supplier's lead time, not from the market, on a supplier with a green light on its scorecard and no delivery failures on record.
- What tightening that lead time is worth, how to price it per unit, and how to open the conversation with a supplier who has never been asked for it.
Written for the people who have to defend the number. Demand planners, inventory and supply chain managers, buyers, S&OP leads, operations and finance managers, and consultants who are asked why the stock is the size it is. If you have inherited a parameter somebody else configured, this book shows you what it costs.
Nothing here needs a new system. Every input used was already sitting in the order book, the general ledger and the goods receipt file. The standard deviation of the lead time, the one number that turns out to matter most, is one subtraction on two columns and an afternoon of work.
Three appendices give the full derivations, every parameter with its source and what a bad measurement of it does, and a plain statement of what the book does not claim, written before the conclusion rather than after it.
The models come with the book. Four Excel workbooks reproduce every figure it prints with live formulas, each with a Checks sheet that shows the rebuild matches the page. Change the inputs to your own part number and the service level, the safety stock and the lead-time price recompute. The closing pages say where to find them.
Stop auditing the output. Price the inputs.
This edition: PDF, 6 x 9 in, 221 pages, DRM-free. The free companion Excel workbooks for this book are at julianrsterling.com/supplychain.