Step 1 — Base Hull Structural Framework
- Frame positioning dimensions
- Stringer placement references
- Hull geometry alignment
- Welding preparation points
- Structural assembly sequence
The exact design shown throughout this website has been fully engineered, physically built, tested on the water for over 2 years, and is now available as a complete fabrication package.
Designed for experienced builders, fabricators, and custom aluminum boat construction.
manufacturearnout@gmail.com