Your Cart
Loading

Tubular Bind Off for 1X1 Ribbing



Set Up: Cut the working yarn, leaving a tail 3-4 times the length of the work to be bound off, and thread the yarn onto a yarn needle. The first stitch here is a knit stitch, so that dictates where to begin. Insert the needle and yarn through the first stitch from left to right knitwise and drop the stitch off of the knitting needle.



Step 1: The sewing sequence is repeated over 4 stitches. It can be helpful to think of it as a set of two purlwise actions followed by a set of two knitwise actions. Begin by inserting the needle from right to left purlwise into the second stitch on the left-hand needle.



Step 2: Next back up and insert the needle from right to left purlwise, into the first stitch on the needle, and drop the stitch off of the knitting needle. That’s the set of purlwise actions.



Step 3: Pass the needle between the first and last stitch from the wrong side to the right side to get the yarn in position to create the correct twist in stitches.



Step 4: Insert the yarn needle knitwise through the second stitch, passing it through to the wrong side of your knitting.



Step 5: Bring the yarn back around to the front, and insert the needle through the first stitch from left to right knitwise and drop the stitch off of the knitting needle. That completes the set of knitwise actions.



Repeat: Repeat Steps 1-5 until the end. Be sure to watch the tension; pull the yarn close but not too tight. When only one stitch remains, stitch into it purlwise, secure the yarn, and weave in ends.