AQA GCSE Design & Technology – Year 10 Clock Design Project | Complete Product Design Resource Pack
Take your Year 10 students through a complete design-and-make project – without spending hours creating the resources yourself.
The Year 10 Clock Design Project is a structured Product Design resource designed to build students’ confidence in the practical, creative and evaluative skills they’ll need for GCSE Design & Technology.
Students work through the complete design process, developing their own clock before manufacturing a finished product using MDF, solid pine and acrylic.
The project combines traditional workshop skills with CAD/CAM and introduces students to GCSE-level design terminology and working practices along the way.
Students will explore and develop:
- Initial ideas and creative design development
- Rendering and modelling
- CAD development and laser cutting
- Accurate marking out and manufacture
- Working with MDF, pine and acrylic
- Workshop tools, equipment and machinery
- Disc sanding and routing
- Templates, jigs and production aids
- Applying timber finishes
- Strip heating and line bending acrylic
- Drilling and accurate assembly
- Diary of making documentation
- Manufacturing planning
- Quality Control (QC) and Quality Assurance (QA)
- Testing against a design specification
- Functional product testing
- User testing and feedback
- Evaluation and identification of improvements
- Links to GCSE NEA skills throughout
The pack includes step-by-step practical guidance, visual examples, student activities, progress checks and evaluation resources, making it suitable for projecting during lessons, printing as individual worksheets or incorporating into student booklets.
Perfect for: Year 10 GCSE D&T / Product Design, Resistant Materials-focused projects, NEA preparation, practical skills development and departments looking for a complete ready-to-use design-and-make project.
Format: Digital PDF resource in landscape orientation.
Delivery: Instant digital download
Please note: This is a digital teaching resource. No physical product will be shipped.