RAMS-19 Highway and Street Works - Temporary Traffic Management - Risk Assessment and Method Statement, Worked Example (Word, UK, 2026)
A complete, paired risk assessment and method statement for Highway and Street Works - Temporary Traffic Management, written as a full worked example on a real-looking UK project, the way a principal contractor's reviewer expects to receive it.
Not a blank form. Every hazard row and every step of the sequence is filled in for a named task, with plant, quantities, named roles and the hold points a reviewer looks for. You edit the specifics for your job; the structure, the control hierarchy and the standards table are already right.
Risk assessment (RAMS-19-RA): 10 hazards, each with who is at risk and how, existing controls, likelihood and severity on a 5 × 5 matrix before and after additional controls, the hierarchy of control from MHSWR Schedule 1, PPE beyond site minimum, emergency arrangements and a review record. Hazards covered include:
- Struck by passing traffic - operatives in the carriageway, setting out and removing signs, working at the taper, drivers ignoring the signals
- Pit collapse - 2.6 m deep in road make-up over clay, traffic vibration and surcharge
- Striking services in the highway - gas main (150 mm MP, indicated 0.8 m), BT ducts, street-lighting cable, water main
- Pedestrians - business park staff, cyclists, the footway on the north side; visually impaired users
- Signal failure, long queues to the Northgate Road junction, driver frustration and abuse
- Working hours and peaks - permit condition 09:30-15:30 for excavation
And 4 more.
Method statement (RAMS-19-MS): scope, persons and competence, 5 items of plant with their inspection requirements, materials and hazardous substances, permits and hold points (6), a 14-step sequence of work with hazards, controls and the check or ITP line for each step, emergency arrangements specific to the task, supervision and stop-work triggers, and the briefing and sign-on record.
Standards and guidance cited, checked at current edition: New Roads and Street Works Act 1991 s.65 (safety measures), s.67 (qualifications of supervisors and operatives), s.54 / permit scheme, Safety at Street Works and Road Works, Traffic Signs Manual Chapter 8 Parts 1 (Design, 2009) and 2 (Operations, 2009); Part 3 (updated 2020), Specification for the Reinstatement of Openings in Highways (SROH), HSG47; CDM 2015 reg 22, EH40/2005; CIS36, EN ISO 20471 (hi-vis classes), ITP C-107 Below-ground drainage. The Standards and Guidance table in the RA names the edition and where it was checked.
Also included: the RAMS Library Index and Delivery Guide with the reviewer's 20-point checklist and the twelve reasons RAMS get rejected.
Need more than one trade? The RAMS Library has all twenty pairs plus the blank RA and MS templates for £245 - all 20 for the price of 7.
Format: two Microsoft Word documents (.docx), A4, branded, unlocked and editable, plus the guide. Single-company licence: use on as many of your own projects as you like; not for resale.
What comes with every StructAssure pack
- 12 months of email support - ask how to apply the documents to your project and a chartered construction professional answers.
- Free updates when standards change - every standard cited is on our watch list; when an edition changes, the revised documents are re-issued to your Payhip download page at no charge.
- Not as described? Put right or refunded - if a file is faulty or the pack is missing something the listing promised, email within 7 days and it will be corrected or refunded.
Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Independently audited before release.