Your Cart
Loading

RAMS Library - 20 Trade Risk Assessments and Method Statements, Worked Examples plus Blank Templates, 43 Documents (Word, UK, 2026)

On Sale
£245.00
£245.00
Added to cart

Twenty complete, paired risk assessments and method statements for the trades a UK principal contractor's reviewer sees most - written as full worked examples on one fictional project, plus the blank pair and a delivery guide with the reviewer's 20-point checklist.

Civils and structure: RAMS-01 excavation and groundworks with services avoidance; RAMS-02 piling (CFA and driven); RAMS-03 reinforced concrete - formwork, reinforcement and pour; RAMS-04 structural steel erection; RAMS-05 scaffold erection and dismantling. Envelope and internal trades: RAMS-06 roofing and work at height on flat roofs; RAMS-07 cladding and curtain walling; RAMS-08 brick and blockwork; RAMS-09 drylining, partitions and ceilings; RAMS-20 painting, decorating and floor finishes. Building services: RAMS-10 mechanical pipework and pressure testing; RAMS-11 ductwork and AHU installation; RAMS-12 electrical installation and LV testing; RAMS-13 fire alarm and emergency lighting. High-risk activities: RAMS-14 demolition and soft strip; RAMS-15 asbestos - non-licensed work and management; RAMS-16 hot works - welding, cutting and torch-on; RAMS-17 confined space entry - manholes and tanks; RAMS-18 lifting operations - mobile crane and telehandler; RAMS-19 highway and street works - temporary traffic management.

Every pair: a two-rating 5 x 5 risk assessment (rated before and after the additional controls, hierarchy of control, standards table with the edition checked) and a method statement with named people and their cards, plant with its inspection regime, materials with COSHH references, permits and hold points, a 10-20 step sequence with the hazards and controls at each step, task-specific emergency arrangements, measurable stop-work triggers and a sign-on record. RAMS-000 carries the index, a ten-step tailoring guide, the reviewer's 20-point checklist and the common rejection reasons; RAMS-T01 and T02 are the blank templates.

Verified against the primary sources (September 2026): CDM 2015, Work at Height Regulations 2005, Confined Spaces Regulations 1997, Control of Asbestos Regulations 2012, Vibration Regulations 2005 (every HAV time computed from Schedule 1), LOLER, PUWER, NRSWA and the Red Book; BS 7671:2018+A4:2026, BS 5839-1:2025, BS 5266-1:2025, BS 5975-1/-2:2024, BS 6187:2011, BS 7121 series, BS EN 1090-2, BS EN ISO 16321-1 (eye protection); HSG47, HSG33 (5th ed), HSG150, HSG168, HSG210, L101, L113, L143, L23, GS6, EH40/2005 (2020) limits; the FPA Joint Code of Practice 10th ed; BCSA, BESA and CWCT guidance; CPCS categories checked on the NOCN list. Independently audited (48 findings, all closed) before release. Every document says it and it is true: your site's own assessment, the principal contractor's rules and the permit conditions in force take precedence.

Format: 43 Microsoft Word documents (A4 landscape), branded, unlocked and editable, in five folders with a READ ME FIRST guide. Single-company licence included.

Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Independently audited and corrected before release; every citation checked against the primary source.

You will get a ZIP (6MB) file