Your Cart
Loading

RAMS-02 Piling - CFA and Driven - Risk Assessment and Method Statement, Worked Example (Word, UK, 2026)

On Sale
£35.00
£35.00
Added to cart

A complete, paired risk assessment and method statement for Piling - CFA and Driven, written as a full worked example on a real-looking UK project, the way a principal contractor's reviewer expects to receive it.

Not a blank form. Every hazard row and every step of the sequence is filled in for a named task, with plant, quantities, named roles and the hold points a reviewer looks for. You edit the specifics for your job; the structure, the control hierarchy and the standards table are already right.

Risk assessment (RAMS-02-RA): 10 hazards, each with who is at risk and how, existing controls, likelihood and severity on a 5 × 5 matrix before and after additional controls, the hierarchy of control from MHSWR Schedule 1, PPE beyond site minimum, emergency arrangements and a review record. Hazards covered include:

  • Rig overturn - platform failure, soft spot, over-flighting, mast raised on a slope
  • People struck by the rotating auger, flights or falling spoil
  • Falls into open bores and pile caps
  • Concrete pump: boom over people, hose whip, blockage clearing, cement burns
  • Cage handling - 12 m, 380 kg cages placed by the service crane; cages unstable on the ground
  • Rig walking and slewing on the platform; plant and pedestrian conflict with Ferrow and deliveries

And 4 more.

Method statement (RAMS-02-MS): scope, persons and competence, 6 items of plant with their inspection requirements, materials and hazardous substances, permits and hold points (5), a 14-step sequence of work with hazards, controls and the check or ITP line for each step, emergency arrangements specific to the task, supervision and stop-work triggers, and the briefing and sign-on record.

Standards and guidance cited, checked at current edition: BS EN 16228-1:2014+A1:2021, BS EN 1536:2010+A1:2015, BS 8004:2015+A1:2020, FPS Working Platform Certificate; BRE BR470 Working platforms for tracked plant, FPS CFA piling: preventing ground and rig instability through over-flighting, BS 5975-1:2024; TW-013 (Temporary Works Control Pack), LOLER 1998; L113, CPA, Control of Noise at Work Regulations 2005 reg 4, ITP C-102 Piling (StructAssure ITP Library). The Standards and Guidance table in the RA names the edition and where it was checked.

Also included: the RAMS Library Index and Delivery Guide with the reviewer's 20-point checklist and the twelve reasons RAMS get rejected.

Need more than one trade? The RAMS Library has all twenty pairs plus the blank RA and MS templates for £245 - all 20 for the price of 7.

Format: two Microsoft Word documents (.docx), A4, branded, unlocked and editable, plus the guide. Single-company licence: use on as many of your own projects as you like; not for resale.

What comes with every StructAssure pack

  • 12 months of email support - ask how to apply the documents to your project and a chartered construction professional answers.
  • Free updates when standards change - every standard cited is on our watch list; when an edition changes, the revised documents are re-issued to your Payhip download page at no charge.
  • Not as described? Put right or refunded - if a file is faulty or the pack is missing something the listing promised, email within 7 days and it will be corrected or refunded.

Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Independently audited before release.

You will get a ZIP (441KB) file