RAMS-03 Reinforced Concrete - Formwork, Reinforcement and Pour - Risk Assessment and Method Statement, Worked Example (Word, UK, 2026)
A complete, paired risk assessment and method statement for Reinforced Concrete - Formwork, Reinforcement and Pour, written as a full worked example on a real-looking UK project, the way a principal contractor's reviewer expects to receive it.
Not a blank form. Every hazard row and every step of the sequence is filled in for a named task, with plant, quantities, named roles and the hold points a reviewer looks for. You edit the specifics for your job; the structure, the control hierarchy and the standards table are already right.
Risk assessment (RAMS-03-RA): 10 hazards, each with who is at risk and how, existing controls, likelihood and severity on a 5 × 5 matrix before and after additional controls, the hierarchy of control from MHSWR Schedule 1, PPE beyond site minimum, emergency arrangements and a review record. Hazards covered include:
- Formwork failure under concrete pressure - inadequate ties, props or kickers
- Impalement on starter bars and projecting reinforcement
- Cage lifts - 420 kg cages by excavator into the excavation
- Excavation sides - 1.4 m battered excavations, surcharge from the pump and trucks
- Wet concrete - alkali burns, chromium VI dermatitis; eye contact
- Concrete pump - boom over people, hose whip, pipeline blockage
And 4 more.
Method statement (RAMS-03-MS): scope, persons and competence, 6 items of plant with their inspection requirements, materials and hazardous substances, permits and hold points (4), a 14-step sequence of work with hazards, controls and the check or ITP line for each step, emergency arrangements specific to the task, supervision and stop-work triggers, and the briefing and sign-on record.
Standards and guidance cited, checked at current edition: BS 5975-1:2024 and BS 5975-2:2024, HSG150, CDM 2015 regs 19, 22, 24, EH40/2005, Control of Vibration at Work Regulations 2005 reg 4 and Sch 1 Part 1, LOLER 1998; L113, CPA, L23, ITP C-103 / C-104 / C-105; TBS-C01. The Standards and Guidance table in the RA names the edition and where it was checked.
Also included: the RAMS Library Index and Delivery Guide with the reviewer's 20-point checklist and the twelve reasons RAMS get rejected.
Need more than one trade? The RAMS Library has all twenty pairs plus the blank RA and MS templates for £245 - all 20 for the price of 7.
Format: two Microsoft Word documents (.docx), A4, branded, unlocked and editable, plus the guide. Single-company licence: use on as many of your own projects as you like; not for resale.
What comes with every StructAssure pack
- 12 months of email support - ask how to apply the documents to your project and a chartered construction professional answers.
- Free updates when standards change - every standard cited is on our watch list; when an edition changes, the revised documents are re-issued to your Payhip download page at no charge.
- Not as described? Put right or refunded - if a file is faulty or the pack is missing something the listing promised, email within 7 days and it will be corrected or refunded.
Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Independently audited before release.