Your Cart
Loading

Task Briefing Sheets Volume 2 - Template plus 12 Worked Examples for Structural, Envelope, Fire-Stopping, M&E and Access Tasks (Word, UK, 2026)

On Sale
£145.00
£145.00
Added to cart

Twelve more completed task briefing sheets for the trades Volume 1 did not cover - structural steel, precast, blockwork, roofing, deep drainage, fire-stopping, lift shafts, cable pulling, lightning protection, scaffold handover, hot works and chilled water testing - plus a refined Volume 2 template and index. Every hold point on every sheet is a real line in the matching ITP.

A task briefing sheet ties the method statement, the ITP hold points and the crew's competence together on one page before work starts. Each worked example names the people, the instruments, the permits and the RAMS in force, the exact ITP line for every hold and witness point, and the three things the crew must not get wrong today. The examples run on one fictional project so the document numbers, permits and names cross-reference the RAMS Library, the ITP libraries, the Site Health and Safety Pack and the Temporary Works Pack correctly.

What you get (14 documents)

  • TBS-000B Task Briefing Sheets Volume 2 - Index and Guide
  • TBS-002 Task Briefing Sheet - Template (Volume 2 layout)
  • TBS-C02 Worked Example - Structural Steel Erection - First Bay and Bolting Up
  • TBS-C03 Worked Example - Precast Stair Flights and Hollowcore Planks by Mobile Crane
  • TBS-C04 Worked Example - Blockwork - Setting Out, DPC and First Lift
  • TBS-C05 Worked Example - Roof Edge Protection and Single-Ply Membrane - First Bay
  • TBS-C06 Worked Example - Deep Drainage Run in a Supported Trench
  • TBS-C07 Worked Example - Fire-Stopping and Penetration Sealing with Photo Record
  • TBS-C08 Worked Example - Lift Shaft Protection and Lifting Beam Installation
  • TBS-E02 Worked Example - Cable Pulling Through Containment and First Fix
  • TBS-E03 Worked Example - Lightning Protection - Roof Network Completion and Earth Resistance Test
  • TBS-G01 Worked Example - Scaffold Alteration Handover - User Side
  • TBS-M02 Worked Example - Hot Works - Pipework Brazing in Plant Room L1-PR2
  • TBS-M03 Worked Example - Chilled Water Pressure Test and Pre-Commission Clean

Verified against CDM 2015 (regs 22, 24, 29), the Work at Height Regulations 2005, LOLER 1998 and COSHH 2002; BS EN 1090-2:2018+A1:2024, BS 5975-1:2024, BS 7121-1:2016, BS 8460:2025, BS EN 13369:2023, BS EN 13670:2009, BS EN 1996-2, PD 6697:2019, BS 6229:2025, BS EN 1610:2015, BS EN 14336:2025, BSRIA BG 29/2021, CIBSE Commissioning Code W (2025), BS 7671:2018+A4:2026, BS EN IEC 62305-3:2024, BS 7430:2026, BS EN IEC 62561-1:2023, BS 7255:2023, BS EN 10025-2:2019, BS 8102:2022, BS EN 1366-3:2021+A1:2024, BS EN 13501-2:2023, BS 9999:2017, BS EN 388:2016+A1:2018, BS EN ISO 16321-1:2022+A1:2025; NASC TG20:21 and SG4:22, NSSS 7th edition, BCSA 36/04, BESA TR/6, the ASFP Red Book and the FPA Joint Code of Practice; HSE HSG47, HSG150, GS4, GS6, L23, CIS36 and EH40/2005. Editions are as the StructAssure Standards Register on 17 September 2026 and listed in the standards-cited sheet in the download.

Format: 14 Microsoft Word documents, A4, branded header and footer with document control, plus the TBS2-STD Standards Cited workbook. Edit freely for your own projects under the single-company licence included in the download.

What comes with every StructAssure pack

  • 12 months of email support - ask how to apply any document to your project and a chartered construction professional answers.
  • Free updates when standards change - every standard cited in the pack is on our watch list; when an edition changes, the revised documents are re-issued to your Payhip download page at no charge.
  • Not as described? Put right or refunded - if a file is faulty or the pack is missing something the listing promised, email within 7 days and it will be corrected or refunded.

Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Written against current British Standards and checked line by line before release.

You will get a ZIP (2MB) file