Your Cart
Loading

MOS For Construction work

On Sale
$3.00
Pay what you want: (minimum $3.00)
$
Added to cart

Method Statement in construction is a document that outlines the manner in which a specific task or activity will be carried out. It provides a detailed description of the steps, processes, and controls to ensure the work is completed safely, efficiently, and in compliance with relevant standards and regulations.

Key Components of a Method Statement in Construction:

  1. Project Information:
  • Project name and location.
  • Client name and contact details.
  • Contractor and subcontractor details.
  1. Activity Description:
  • A clear description of the task or activity to be performed.
  • Scope of work and objectives.
  1. Sequence of Work:
  • Step-by-step breakdown of how the task will be carried out.
  • Tools, equipment, and materials required.


  1. Personnel Involved:
  • Names and roles of workers involved in the task.
  • Qualifications, training, and certifications required.
  1. Permits and Approvals:
  • List of permits or approvals required (e.g., hot work permits, confined space entry permits).


  1. Quality Control:
  • Procedures to ensure the work meets specified standards and requirements.



  1. Drawings and Diagrams:
  • Visual aids such as sketches, plans, or diagrams to clarify the process.
  1. Signatures and Approvals:
  • Sign-off by relevant parties (e.g., site manager, safety officer, client representative).


You will get the following files:
  • DOC (40KB)
  • DOC (39KB)
  • DOC (82KB)
  • DOC (45KB)
  • DOC (43KB)
  • DOC (55KB)
  • DOC (56KB)
  • DOC (50KB)
  • DOC (56KB)
  • PPTX (18MB)
  • DOC (44KB)
  • DOC (40KB)
  • DOC (69KB)
  • DOC (293KB)
  • DOC (48KB)
  • DOC (58KB)

Customer Reviews

There are no reviews yet.