TurnoverSpec Handover Kit
TURNOVERSPEC Handover Kit
Everything you need to make asset turnover a requirement — not a hope.
One complete system for use in your company.
TURNOVERSPEC Handover Kit
Everything you need to make asset turnover a requirement — not a hope.
One complete system for use in your company.
TurnoverSpec Handover Kit (complete bundle) — $297
Everything you need to make asset turnover a requirement — not a hope.
Stop finding out what the owner needed after the building is finished — specify it, stage it, and verify it before a single dollar is spent.
What's inside:
Basis of Specification (the why and when)
Section 01 78 10 — Asset Information Requirements (the contract mechanism)
Section 01 78 25 — Owner's AIR (the 27-field schedule)
The AIR Matrix — a 4-tab Excel workbook with live formulas, the same schedule ready to populate
Five stage-gate review checklists (Brief → Handover), one page each
The verification protocol — the four checks, how to sample, and how to reject a bad submission without an argument
Who it's for: Owners, owner's reps, VDC/BIM managers, General Contractors, Sub-Contractors, and facility teams who want the whole framework in one place — priced below buying the three documents separately ($317 vs. $297), with the matrix, checklists and verification protocol included at no extra cost.
License: For use on your own projects and by your own organization. Not for resale or redistribution as a standalone product.
Here are all the products that are included in your bundle