Your Cart
Loading

Hotel Contractor Permit-to-Work Pack: Permit to Work Forms for Hotel Contractors

On Sale
Sale ends in 5 days
$6.00 (20% off)
$4.80
Added to cart

Full description

For chief engineers, hotel managers and safety leads who need a simple, written way to control contractors and high-risk work. The pack sets out who approves a contractor, who issues and accepts a permit, which permit each job needs and how the area is handed back. The permit forms are one page each, so you can print them as pads or fill them in on screen. You replace the bracketed values with your own limits and have the forms checked against local rules before use.

Save with a bundle: this template is also in the Hotel Engineering, Safety & Compliance Bundle, 11 templates for $35 instead of $83. All 141 templates are in the All-Access Hospitality Template Library for $79.

What is inside

  • Hotel_Contractor_Permit_to_Work_Pack.docx (editable Word file) and Hotel_Contractor_Permit_to_Work_Pack.pdf (print version), 15 A4 pages.
  • Contractor control procedure: 7 roles, 7 key terms, 12 procedure steps and 6 permit validity rules.
  • "Which permit do I need?" matrix: 18 example hotel jobs mapped to 5 permit types.
  • Contractor rules on site: 14 numbered rules.
  • Contractor pre-qualification checklist (12 checks) with an approval block.
  • Contractor induction checklist (24 points in 3 groups), induction record and a sign-off table for 6 workers.
  • 5 one-page permit forms, each with 12 precaution checks and a 4-stage sign-off: general permit, hot work permit with fire watch record, working at height permit, confined space entry permit with atmosphere test and entry log, electrical isolation permit with a lock and tag record.
  • Permit register layout with 18 rows (2 filled examples).
  • Permit spot-check form (12 checks) and close-out checklist (16 checks).
  • 124 check items in total. README.txt and LICENSE-and-Terms.txt.

How it works

  1. Read the procedure and agree the roles with your heads of department.
  2. Replace every [bracketed] value, such as permit validity, noise hours and gas test limits.
  3. Pre-qualify and induct each contractor, then issue the permits the matrix calls for.
  4. Log every permit in the register, spot-check live permits and close each one with the close-out checklist.

Details

  • Formats: Word (.docx) and PDF.
  • Language: English. A4 layout.
  • Software: Word or any word processor that opens .docx files; any PDF reader.
  • Delivery: instant digital download. Nothing is shipped.

Good to know

  • This is a template, not legal, engineering or safety advice. Permit rules, licences and gas test limits differ by country. Verify local regulations and check the forms with a competent safety adviser.
  • The two register rows and the bracketed values are illustrative.
  • Single-user license. Do not share or resell the files.

FAQ

Can I change the permit forms?

Yes. The Word file is fully editable. Add or remove checks and change the bracketed limits.

Does it cover live electrical work?

No. The electrical isolation permit is for work on equipment that is isolated and proved dead.

Can I use it for in-house maintenance staff?

Yes. The procedure applies to contractors and to your own engineering team doing high-risk work.

Is it valid in my country?

It is a general template. Check it against local regulations and with your insurer before use.

What software do I need?

Word or another program that opens .docx files. The PDF opens in any PDF reader.

You will get a ZIP (204KB) file