Commissioning and Test Plan Pack - 8 Commissioning ITPs, 11 Test Record Forms, Commissioning Plan and Witness Record
Everything needed to plan, carry out, witness and record the testing and commissioning of building services - eight commissioning inspection and test plans, eleven printable test record forms with the acceptance limits printed on the sheet, a commissioning plan template with a fully worked example, and a witness test record.
Commissioning is where handover packs fall apart: results recorded on scraps, witness tests nobody can evidence, certificates that cite the wrong standard. This pack gives every test a plan, a form and a record trail that a client's engineer or a certification body will accept.
Commissioning ITPs (template + worked example each): T-030 LV electrical installation testing and verification (BS 7671:2018+A4:2026 Part 6, GN3); T-031 fire detection and alarm commissioning (BS 5839-1:2025 clauses 37-41); T-032 emergency lighting commissioning (BS 5266-1:2025, BS EN 50172:2024); T-033 air systems (CIBSE Commissioning Code A:2024, BSRIA BG 49/2024); T-034 heating and chilled water systems (CIBSE Code W:2025, BG 29/2021 flushing, BS EN 14336:2025); T-035 domestic hot and cold water (BS EN 806-4, BS 8558, HSG274 Part 2 2024); T-036 BMS and controls (CIBSE Code C, BG 49/2024); T-037 integrated systems test and cause-and-effect (BS 7346-8, BS 7273-4, BS 9999).
Test record forms (blank + worked example each, landscape A4, Pass/Fail per row, NCR box, three-party sign-off): TR-01 insulation resistance and continuity; TR-02 earth fault loop impedance and prospective fault current; TR-03 RCD; TR-04 polarity and functional; TR-05 pressure test certificate; TR-06 flushing and water quality; TR-07 air balancing (with % of design formulas); TR-08 water balancing; TR-09 fire alarm cause-and-effect matrix; TR-10 emergency lighting; TR-11 BMS point-to-point schedule.
Word documents: TCP-001 Commissioning Plan template structured to CIBSE Code M:2022 and BSRIA BG 8, plus the completed NBP-CME-TCP-014 worked example; WIT-001 Witness Notice and Witness Test Record.
Every standard was checked at its current edition before release (CIBSE Codes W:2025, A:2024 and M:2022; HSG274 Part 2 second edition; BS 5839-1:2025 clause numbers read from the standard's contents). Where a tolerance is project-specific the form says so rather than inventing a number. Set on the same worked example project as the ITP packs and the Project Quality Plan.
Format: 19 Excel workbooks and 3 Word documents, branded header and footer with document control. Edit freely for your own projects under the single-company licence included.
Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Checked line by line before release.