Site-Specific RAMS - Written For Your Project (Risk Assessment & Method Statement)
What you're buying: a risk assessment and method statement written for your job, by a person, and sent to you by email. The small PDF you download at the checkout is the short intake form we need you to fill in. Your RAMS itself follows by email in Word and PDF.
You don't need another blank RAMS template. You need the RAMS done.
Free generators give you a form with your trade dropped into it. Principal contractors and clients bounce those back for being generic - and rightly so, because a RAMS that isn't specific to the site isn't worth the paper. So you end up writing it yourself at 9pm the night before you start.
This is the other option: send the details of the job, and get back a complete, site-specific Risk Assessment and Method Statement, written properly, ready to issue.
WHAT YOU ACTUALLY GET - THE LAST ONE RAN TO 17 PAGES
Document control - reference, revision, issue date, review date, distribution and validity
Scope of works - what is included, what is excluded, stated plainly
Project and site details - access, working hours, occupancy, duration, welfare, CDM status
Legislation schedule - every regulation that applies to your job, listed: HSWA 1974, CDM 2015, CAR 2012 and HSG264, COSHH, Manual Handling, Work at Height, PUWER, Noise and Vibration, Electricity at Work and BS 7671, Gas Safety, PPE, the Fire Safety Order, RIDDOR and the relevant Building Regulations
Roles and responsibilities - who is accountable for what, by role
Pre-commencement survey schedule - the checks signed off before anyone starts
Method statement - the sequence of works, phase by phase, describing how each stage is actually carried out safely
Plant, tools and equipment - with the specific requirement against each item
PPE schedule - what is mandatory and exactly when
COSHH - substance by substance, with the hazard and the control
Risk assessment - every significant hazard scored individually on a 5x5 matrix, before and after controls, with the control measures written out in full
Emergency arrangements - including the specific actions for gas escape, electric shock, escape of water and suspected asbestos disturbance
Environmental and waste management - segregation, duty of care, transfer notes
Monitoring, supervision and competence - cards, certification, briefings, inspection
Operative briefing and declaration - the signature record that proves it was briefed
WHY IT ISN'T INSTANT: because it's written for your job, by hand. Turnaround is 3-5 working days. If you need it that week, order at the start of it.
HOW IT WORKS
- Buy here. You immediately download an intake pack with the questions we need answered.
- Reply to your order confirmation email with the answers - about 10 minutes, short answers are fine.
- We may come back with a couple of questions if something needs pinning down.
- Your RAMS arrives by email within 3-5 working days, as PDF and Word so you can revise it yourself later.
- If the principal contractor rejects it, we rewrite it free until they accept it — the job as briefed, within 30 days of delivery.
WHO IT'S FOR: small contractors and sole traders who need to issue a proper RAMS for a live job, and would rather spend the money than an evening - or than lose the job for sending something generic.
Built by a working site manager, 20+ years. Used on live projects, not written by a template farm.
Important: this is drafting support, not a substitute for your own duty of care. The document must be reviewed, amended where necessary, and signed by a competent person within your business before it is issued or relied on. It does not include a site visit, and we do not act as your CDM Principal Designer or safety consultant. If the principal contractor rejects it, we rewrite it free until they accept it, for the job as briefed, within 30 days of delivery; changes to the job itself are quoted separately. Liability is limited to the fee paid.