Construction Site Fire Safety Pack - Fire Plan, Risk Assessment and Records to HSG168 and the Joint Code of Practice, 21 Documents (Word + Excel, UK, 2026)
A complete construction-phase fire safety system: the fire plan with a full worked example, the coordinator's appointment, the hot works controls, the extinguisher calculator, the registers, the drill record, the fire service liaison pack and the Regulation 38 handover schedule - every clause cited to the Joint Code of Practice 10th edition (with Amendments 1 and 2) and HSG168 3rd edition.
What you get (21 documents): FS-000 index and guide; FS-001 Construction Phase Fire Safety Plan template (20 sections mapped to JCoP 6.2) and FS-002 worked example at fit-out phase; FS-003 fire safety coordinator appointment with 17 duties by clause; FS-004 fire risk assessment review record (RRFSO article 9); FS-005 means of escape and fire point checklist by floor and phase; FS-006 temporary alarm commissioning and weekly test record; FS-007 hot works procedure (JCoP clause numbers, fire watch 60 minutes plus checks to 120 minutes, two extinguishers including 13A); FS-008 hot works register with automatic watch and check timings and audit; FS-009 extinguisher provision calculator, schedule and monthly check to BS 5306-8:2023 and BS 5306-3:2017; FS-010 compartmentation and fire door progress tracker; FS-011 flammables, LPG and gas cylinder register and storage checklist (DSEAR, HSG51, JCoP separation distances); FS-012 timber frame fire management supplement (STA 16 Steps, separating distances); FS-013 temporary electrics and heating checks; FS-014 arson risk assessment and scored security checklist; FS-015 drill and evacuation record with roll call and timings; FS-016 fire and rescue service liaison and site information pack; FS-017 fire incident report and investigation with the RIDDOR tests; FS-018 weekly fire inspection (44 items, section scores, RAG); FS-019 induction content and attendance; FS-020 Regulation 38 and Fire Safety (England) Regulations 2022 handover schedule.
Verified against the FPA Joint Code of Practice 10th ed (Aug 2022) incorporating Amendment 1 (Jan 2023) and Amendment 2 (May 2025), HSG168 (3rd ed 2022), HSG51 (3rd ed 2015), RRFSO 2005 as amended 1 Oct 2023, CDM 2015 regs 29-32, DSEAR 2002, Building Regulations reg 38, Fire Safety (England) Regs 2022, BS 5839-1:2025, BS 5266-1:2025, BS 5306-8:2023, BS 5306-3:2017, BS 9999:2017, BS 8214:2026, BS 7375:2010, BS 9990:2015 and STA guidance. Every workbook formula evaluated (817 formula cells, zero errors); worked example corrected after an independent review. The Principal Contractor's fire plan and the fire and rescue service's advice govern.
Format: 10 Microsoft Word documents and 11 Excel workbooks, A4, branded, unlocked and editable. Single-company licence included.
Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Independently audited and corrected before release; every citation checked against the primary source.