Your Cart
Loading

Lifting Operations Pack - Lift Plans, Appointed Person Records, Calculators and Registers to BS 7121 and LOLER, 21 Documents (Word + Excel, UK, 2026)

On Sale
£145.00
£145.00
Added to cart

Everything a contractor needs to plan, control and record lifting operations to BS 7121-1:2016 and LOLER 1998: the procedure, the appointments, four worked lift plans, the calculators and the registers - built the way a principal contractor's lifting reviewer expects to see them.

What you get (21 documents): LO-001 Lifting Operations Procedure (LOLER regs 4-11 and Schedule 1, L113 paragraph references, BS 7121-1 roles, basic/standard/complex categories, contract lift versus crane hire per CPA CIG 2308, ground, exclusion zones, GS6 distances, wind method, thorough examination intervals); LO-002 Appointed Person appointment; LO-003 crane supervisor and slinger/signaller appointment and competence record with CPCS categories; LO-004 mobile crane lift plan template plus a full worked example (4.2 t AHU roof lift with a 100 t all-terrain crane: capacity chart utilisation, outrigger loads, mat sizing, wind reduction, hook-height check against the edge protection, 12-step sequence, contingency); LO-005 tower crane routine lifts schedule; LO-006 lorry loader and telehandler lift plan; LO-007 excavator used as a crane; LO-008 lifting method statement; LO-009 lift category tool; LO-010 load and rigging calculator (gross load, centre of gravity, sling angles and tensions, chain and shackle selection, EN 13000 and EN 13001-2 wind bases); LO-011 ground bearing and mat calculator; LO-012 equipment and accessories register with thorough examination due dates and colour-code tag; LO-013 pre-use checks (mobile, tower, crawler); LO-014 tower crane erection, climbing and dismantling checklist; LO-015 thorough examination tracker; LO-016 lift log; LO-017 lift briefing and sign-on; LO-018 wind and weather hold record; LO-019 incident, near miss and dropped-object report; LO-020 contract lift versus crane hire decision and CPA conditions checklist.

Verified against LOLER 1998, L113 (2nd ed 2014, 2018 amendments), BS 7121-1:2016, -2-1/-2-3/-2-5:2012, -2-4:2025, -3:2017+A1:2019, -4:2010, -5:2019, BS 7212:2026, BS EN 13414-1, BS EN 1492-1/-2, BS EN 818-4, BS EN 13889, GS6 (4th ed 2013), CPA Model Conditions 2021, CIG 2308 Rev 1 (May 2026), TCIG 2602 (2026), CIG/TCIG 2507 wind guidance (2025) and RIDDOR Schedule 2. Every workbook formula evaluated; worked examples corrected after an independent engineering review. Crane charts and ground values in the examples are illustrative - your crane's data and the Appointed Person's judgement govern.

Format: Microsoft Word and Excel, A4, branded, unlocked and editable. Single-company licence included.

Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Independently audited and corrected before release; every citation checked against the primary source.

You will get a ZIP (2MB) file