ITP E-015 Cable Containment - Inspection and Test Plan Template with Worked Example (Excel, UK, 2026)
A complete inspection and test plan for cable containment: a blank template and a fully worked example, written the way a Tier 1 quality reviewer expects to receive it.
Containment is where most electrical rework originates: wrong support centres, missing fire-stopping, and routes clashing with other services. This ITP front-loads the checks that are cheap before cabling and expensive after.
What is in the workbook: a Read Me First sheet, the blank Template and the Worked Example with 14 inspection lines (3 hold points), each with the activity, the acceptance criterion, the reference (BS 7671, BS EN 50085, BS EN 50085-1, BS EN 61386, BS EN 61386-1, BS EN 61537), the inspection level (H/W/S/R), the record produced and three-party sign-off columns.
Points specific to this activity:
- Support spacing comes from the manufacturer and the specification, not from BS 7671. Cite the manufacturer's installation instruction by document and section.
- Fire-stopping of penetrations is a special process under PR-013: it cannot be verified after the finish goes on, so it is a hold point with a photographic record per penetration.
- Segregation from other services and from Band I/Band II circuits (BS 7671 Section 528) is checked before cabling, when it can still be corrected.
Part of the StructAssure ITP Starter Pack (M&E) - buy the full library to get every ITP at a lower price per document, or the Complete Site Quality System for everything. Every standard was checked against the current edition on 16 September 2026; your project specification takes precedence over the standards cited.
Format: one Microsoft Excel workbook (.xlsx), A4 landscape, branded, unlocked and editable. Single-company licence included.
Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM).